NGICT-concept on an inland terminal with a throughput of 100.000 – 150.000 TEU / year (preliminary study).
SITUATION

INLAND CONTAINER TERMINAL
- Throughput 100.000 – 200.000 TEU / year
- Quay length ± 200 m
- Terminal area ± 3 hectares
TOP VIEW

ARTIST IMPRESSION RIVER-SIDE

ARTIST IMPRESSION LAND-SIDE
