Home
  • Home
    • About us
    • Publications
    • Offer
    • Animations
  • News
  • Projects
    • Animations
    • Deepsea terminals
    • Offshore terminals
    • Mega-hub
    • Inland terminals
    • Inland container transferium
    • Inland transhipment transferium
  • Equipment
    • OverHead Bridge Crane (OHBC)
    • Support structures
    • Reefer stack construction
    • ML-RM-SHC
    • Shunter
    • 2-D-AGV
    • 1-D-AGV
    • Firefighting
    • AEDS
  • Logistic principles
    • Transfer zone STSC ↔ stack
    • ML-RM-SHC
    • Transfer zone stack ↔ truck
    • Truck loading area
    • Train handling
    • Transfer point OHBC ↔ AGV
  • Environment
    • Energy consumption
  • Contact

NGICT

NEW GENERATION INTEGRATED CONTAINER TERMINALS

Inland terminals

Inland terminals

  • Inland container terminal (100.000 – 150.00 TEU)

    NGICT-concept on an inland terminal with a throughput of 100.000 – 150.000 TEU / year.

  • Inland container terminal (20.000 – 40.000 TEU)

    Study of the minimum economic scale for an inland terminal using the NGICT concept, based on a throughput of 20.000 – 40.000 TEU / year.

NGICT small-size inland container terminal

Receive updates




RSS Port of Antwerp

  • New intermodal connections January 2021 28 december 2020
  • New intermodal connections December 2020 28 december 2020
  • Aptus wins third innovation challenge Smart Docking 24 december 2020
  • The Single Window for Inland Navigation is live from 04/01/2021 22 december 2020
  • New direct rail link to four-country region 15 december 2020
© 2020 | Koch adviesgroep | Design - www.remaco.nl